Enough power to supply 123 homes annually
Repairs are currently underway on the wind turbines located on campus, two of which have been inoperable due to lightning strikes, and they should be operational in a few weeks. ONU has amended and extended its contract with NexGen, which will cover all costs to repair and upgrade the turbines. Each turbine is 220 feet tall and generates 400 kilowatts of power or enough to supply 123 homes annually. (Monty Siekerman photo)
Stories Posted This Week
Saturday, September 12, 2026
Friday, September 11, 2026
- Darrell Lee Diller, 92, managed a farming business
- Bulldog boys soccer loss vs. Van Buren
- Bulldog volleyball wins in four vs. Allen East
- Deer archery hunting begins Sept. 12 in Disease Surveillance Area
- Andrew Allen named 2026 Hardin County Fair King
- Ada Soccer Association unveils new website
- Grand Reopening of Whatever Cards & Games on September 14