Major street work
Two major Ada streets are involved in major pavement repairs this week.
The project also includes installation of curb ramps and concrete sidewalks within the village of Ada.
On South Main the grinding takes the street down to the former brick Main Street of a century ago. A photo below reveals about 6 inches of pavement laid over the years since the street was bricked.
The streets are:
• State Route 81 between the western village limits and Township Road 55
• State Route 235 between the northern village limits and State Route 309
The work has turned much of Main Street into a one-lane roadway.
Watch the video of work in progress at the bottom of this story -
State Route 81 between the western village limits of Ada and township Road 55, within the village of Ada, will be restricted to one lane through the work zone for pavement repairs being done in preparation for pavement resurfacing.
State Route 235 between the northern village limits of Ada and state Route 309 will be restricted to one lane through the work zone for pavement repairs being done in preparation for pavement resurfacing.
Both projects are being performed by Bluffton Paving, Bluffton.
Stories Posted This Week
Tuesday, July 7, 2026
Monday, July 6, 2026
Saturday, July 4, 2026
Friday, July 3, 2026
- Bluffton Icon headlines, July 3
- OPEN POLL What's your top traffic safety priority in Ada?
- Sharon E. Fess worked for ATI
- Ada Bulldogs girls soccer alumni game signup
- Gerald “Jerry” Myers was a pastor
- Summer Crisis program begins July 1
- Bluffton roundabout opens, Pocono closes at SR 103
- Why Icon Facebook comments are moderated
- Ada VFW Park in the Park event to honor veterans and America 250